Kuleba: half of Ukraine's energy system is damaged, allies are behind schedule with aid deliveries
At the Zvirynetska metro station in Kyiv replacing letters from the old name has started
Armenia and NATO agree on cooperation for 2024
HRW confirms execution of Ukrainian soldiers who surrendered by Russian soldiers this winter
A fire broke out in a residential building in Kyiv region: two people were injured
One of the largest banks in the United States announced the threat of asset confiscation in Russia
Family with a teenager rescued from Russian occupation
The Pentagon said it is concerned about the deepening of relations between the DPRK and Russia that together with Iran is fueling Russia
Biden links economic problems of China, India and Japan to "xenophobia"
The United States accuses Russia of using chemical weapons against the Ukrainian Armed Forces and announces new sanctions
Popular
Hunting for a mole: why Yulia Tymoshenko's MP closed his declarations
Air Force answered whether Ukraine is ready to receive new F-16 aircraft
Britain has sent Ukraine a new military aid package: what it includes
Changes in the Government: MP announces consideration of personnel issues in the Verkhovna Rada this week
Plus 1400 occupants and 14 tanks: General Staff updates data on enemy losses
Publications
The death of Iran's president: who was Raisi and what is known about his successor
Hunting for a mole: why Yulia Tymoshenko's MP closed his declarations
Attempt on the Prime Minister of Slovakia: xenophobia and the Russian trace
The law on strengthening mobilization: what will change after May 18 for those liable for military service
The Housing Capital case: where did the billions go?
Kuleba: half of Ukraine's energy system is damaged, allies are behind schedule with aid deliveries
Ukraine's Foreign Minister Kuleba said that the US aid package has boosted morale, but that a Patriot battery would have boosted it even more, as Ukrainians suffer the most from Russian missile attacks. And half of Ukraine's energy system is damaged.
At the Zvirynetska metro station in Kyiv replacing letters from the old name has started
The 52 characters of the new name of the Zvirynetska station were installed at the Kyiv subway station, replacing the old name of Druzhby Narodiv.
Armenia and NATO agree on cooperation for 2024
Armenia and NATO agreed on a military cooperation program for 2024 and outlined areas of cooperation during consultations at NATO Headquarters in Brussels.
HRW confirms execution of Ukrainian soldiers who surrendered by Russian soldiers this winter
According to an investigation by Human Rights Watch, since December 2023, Russian soldiers have executed at least 15 Ukrainian soldiers who tried to surrender, and possibly 6 more.
A fire broke out in a residential building in Kyiv region: two people were injured
A fire broke out in a one-room apartment in Mykhailivska-Rubezhivka, Kyiv region, evacuating 13 people, including 5 children, and poisoning two people with carbon monoxide.
One of the largest banks in the United States announced the threat of asset confiscation in Russia
JPMorgan Chase is facing potential confiscation of its assets in Russia due to lawsuits filed by Russian banks seeking to recover funds blocked by US sanctions.
Family with a teenager rescued from Russian occupation
Save Ukraine volunteers helped evacuate a 16-year-old boy and his family from the temporarily occupied Kherson region, and now they are safe and receiving medical and psychological assistance.
The Pentagon said it is concerned about the deepening of relations between the DPRK and Russia that together with Iran is fueling Russia
The U. S. Department of Defense is concerned about the deepening ties between North Korea and Russia, that together with Iran is fueling Russia's illegal war against Ukraine.
Biden links economic problems of China, India and Japan to "xenophobia"
Biden believes that "xenophobia" in China, Japan, and India is contributing to the slowdown in economic growth in these countries.
The United States accuses Russia of using chemical weapons against the Ukrainian Armed Forces and announces new sanctions
The United States accused Russia of using chloropicrin chemical weapons against Ukrainian troops and imposed new sanctions on Russian organizations involved in chemical and biological weapons programs.